• Change country
  • Hongkong

Regional Office HAURATON Asia
Lot 20-01, Level 20, Menara Hap Seng 2. Plaza Hap Seng, No. 1 Jalan P. Ramlee
50250 Kuala Lumpur / Malaysia
+60162667089
javier.monje@hauraton.com

HAURATON Approvals

General Building Controls Approval

HAURATON was awarded the general building controls approval No. Z-74.4-25 in accordance with § 19 Federal Water Act by the German Institute for Construction Technology (DIBt). With this HAURATON fulfils all requirements for drainage channels for bottling plants within the meaning of the guidelines from the Working Group of the Federal States on Water Problems (LAWA).

Allgemeine bauaufsichtliche Zulassungen
 
 
 
 

Regional Office HAURATON Asia
Lot 20-01, Level 20, Menara Hap Seng 2. Plaza Hap Seng, No. 1 Jalan P. Ramlee
50250 Kuala Lumpur / Malaysia
+60162667089
javier.monje@hauraton.com

 

Imprint        Privacy policy